The cabinets were delivered and will be installed this week. The kitchen and all the bathrooms have the same cabinet style. I can't wait to move in! It is getting closer.
This is in the kitchen with the tile flooring.

It is starting to come together. The cabinets in the left of the picture will be finished on the backside and it will have a raised bar to help block the dirty dishes from the living room while maintaining an open floor plan.

This is a solution the builder came up with that I think will work out nicely. The cabinet below (which the stained interior) is designed to hold the microwave, with a drawer below.

Rick's office is full of cabinet door fronts and drawers, and shelving.

This is the pull (I just placed it against the door front) for the master and hall bath.

The doors for downstairs arrived this week also. The doors looks awesome. Rick and I are tempted to ask how much it would be to upgrade the doors upstairs too.

Coming in for her close up.

The doors with the molding and flooring.
Don't get me wrong the upstairs doors do not look bad, just not as lovely at the wood doors (example: upstairs hall linen closet).
