Almost all the windows are installed. Only one window on the back top floor is not installed.
Crews have been busy installing electrical wiring, plumbing lines, and heating/cooling ducts.
Heating ducts in the future attic space.
future home of the washer and drawer.
furnace room in the basement.
I am practicing for my future tub location. I can't wait for my first soak in the big tub. :-)