Saturday, February 14, 2009

More Framing

Rick took this picture Friday afternoon, Feb 13, 2009.  The framing for the basement is started now on to the main floor.  The very right edge of the picture the flooring grade is a little lower, this the storage area of the garage.  The garage and the storage area will be the same level.  The garage will be about 5 steps lower then the main floor of the house.  Not how the house plan was designed, but a reasonable adjustment to accommodate the topography of the property. 

IMG_4198

This photo is from Saturday, Feb. 14, 2009.  You can start to see our main floor is going to be at about our (westerly) neighbors roof line.  It is difficult to explain the grade and topography of the lot and neighborhood.  Let's just say the neighborhood is called Hillsdale for a reason. :-) 

It looks like Scott (builder) has began adding rock for the garage floor.

IMG_4202

 

This photo is from Saturday too.  You can see our main floor will be a little lower then the (easterly) neighbor.  I wanted to walk on the sub-flooring, but thought it was probably not the safest things for me to do, and 2 it's was muddy to get to it and I didn't want to get my shoes dirty. :-)

This corner is where Rick's office will be. 

IMG_4204

No comments:

Post a Comment