Friday, July 24, 2009

Cabinet Installation

They are making progress getting the cabinets installed. 

The range will fit between the two base cabinets.  We did 2 large drawers on the bottom for pots and pans and a smaller drawer on top for cooking utensils.  Hopefully this proves to be a good work space.

IMG_5043

The smaller cabinets at the very top will have frosted glass. 

IMG_5029

All the windows on the main level and this one on the stair landing have a full wood wrap.  I do not want to cover up the wood work with window coverings.  Rick and I are single handedly keeping the wood products industry afloat in Oregon.  he he he.....

IMG_5042

This is the deco tile inserts for the master bath shower.

IMG_5040

No comments:

Post a Comment