The footing is poured and now on to the foundation. I spoke with the builder yesterday (Friday, Jan. 30). The foundation will be poured on Tuesday (Feb. 3). Framing will begin shortly after that.
I stopped by today (Saturday) and the foundation forms are in place.
These images show how close the house is to the neighbors on each side. The set back is 5 feet from the property line on each side.
No comments:
Post a Comment